彩钢夹芯板的存放、搬运和安装

发布时间:2015-8-29 9:17:02 浏览次数:670




彩钢夹芯板在安装之前应尽可能保留出厂时的包装,宜存放于室内。如堆放在室外,堆放地点应平整,不得有积水且上空不应有起重设备和重物经过,板下用垫木垫高20cm,板与板之间要放置软性材料,同型号的板放置在一起,每垛板上应有易于识别的板型标签,并覆盖防雨油布。堆放场地应设置临时围挡,避免人员走动造成板材不必要的损坏。

幕墙板的安装一般采用活动脚手架,在保证施工脚手架的承载能力时,还要考虑到:

(1)幕墙面、作业面与轴线之间的距离;

(2)对照参考面找出控制点的间距与位置,注意通视性;

(3)对照参考面找出安装角的间距;

(4)与控制标高之间的水平差;

(5)与建筑物竖向的间距及与各楼层的间距。



Caigang sandwich board before installation should keep factory packaging, as far as possible should be stored in indoor. Such as stacked in outdoor, pile location should level off, can not have water and should not be above the lifting equipment and heavy, with stow-wood mat under the plate 20 cm high, board with board between to place soft materials, the same model of plate placed together, every buttress plate should be easy to identify label plate type, and cover rain tarps. Stacking area should be set up temporary WeiDang, avoid unnecessary damage cause plank personnel ambulates again.

Installation of curtain wall plate, generally use mobile scaffold, guarantee the construction scaffolding carrying capacity, but also to:

(1) the curtain wall surface, surface and the distance between the axes;

(2) the spacing and the location of the reference surface to find control point, pay attention to the visibility;

(3) the reference surface to find installation Angle of spacing;

(4) and the control level, the level difference between

(5) and vertical spacing and the spacing of the floors of buildings.