钢结构安装施工中的其他安全措施分析与研究

发布时间:2015-9-17 9:55:52 浏览次数:685
严格执行各项钢结构安装施工安全管理制度和安全操作规程、标准、规范,并做好各项安全防护措施,严格“三宝、四口”防护。严格执行安全用电的规定。高空作业搭设安全脚手架、安全护栏和安全网进行防护,作业人员必须戴安全带。
钢结构安装施工吊装作业区应设警戒线,作明显标志,并设专人负责。除在钢梁、钢柱上悬挂安全绳外,在临边防护没有及时跟上时应在楼层临边、洞口设置红白相间的警戒线,并在临边楼层处设置警示标志(高处作业必须挂好安全带或安全标语、口号等)。
吊装工作严禁非施工人员进入或通过吊装区域。正式吊装前进行试吊,检查吊装机具、绳索、锚固点的工作情况。确认无误后,方可正式吊装。吊装动作平稳,多台卷扬机共同工作时,启动停止动作要协同一致,避免工件振动和摆动。就位后及时找正找平,工件固定前不得解开吊装索具。吊装过程中如因故暂停,必须及时采取安全措施,并加强现场警戒,尽快排除故障,不得使工件长时间处于悬吊状态。参加钢结构安装施工吊装的人员必须坚守岗位,服从命令听统一指挥,对不明确的信号应立即询问,严禁凭猜测进行操作。
现场岗位人员必须具备必要的起重知识,并熟悉有关规程、规范。主要构件吊装应尽量在上午进行,其他吊装工作应尽量在白天进行,避免在夜间作业。夜间作业必须具备足够可靠的照明。严禁在风力四级和四级以上进行吊装,雨雪天气也不得进行吊装作业。钢结构安装施工吊装时,施工人员不得在工件下面、受力绳索具附近及其他有危险的地方停留。吊装时任何人不得随工件或吊装机具升降,特殊情况必须随同升降时,必须采取可靠的安全措施并经有关负责人批准。

构件吊装应有钳工、电工等负责维护吊装机具设备,停止工作时应确保切断电源。所有钢结构安装施工施工人员必须佩带安全帽,高空作业必须有安全带。严禁酒后钢结构安装施工作业和生产瞎指挥,严禁强行违章操作。


Strictly implement various steel structure installation construction safety management system and safety operation procedures, standards, specifications, and various safety protection measures, strict "sanbao, four" protection. Strictly implement the provisions of the safe electricity. The work high above the erection of safety scaffolding, safety guardrail and safety net for protection, homework personnel must wear a seat belt.

Working in the steel structure construction hoisting installation should set up a cordon, make clear sign, and is responsible for by designated personnel. Except on the steel beam and steel column hanging outside the safety rope, when in the border protection for failing to keep up with the red and white cordon floor over the edge, the mouth of the cave, and in the near edge of the floor set up warning signs (high homework must hang the safety belt or safety signs, slogans, etc.).

Assembly work of construction personnel are strictly prohibited to enter or through assembly area. Formal trial crane hoisting before, and monitor the performance of the hoisting machinery, ropes, anchor point. After confirmed, before officially lifting. Lifting movements smooth, many sets of hoist when working together, start stop to concerted, avoid workpiece vibration and swing. In place timely find is leveling, after the workpiece fixed before may not solve hoisting rigging. Hoisting process such as suspension, must take safety measures, and strengthen the alert, troubleshooting as soon as possible, may make the artifacts in a suspended state for a long time. For steel structure construction hoisting installation personnel must stick to jobs, obey orders to listen to a unified command, to not clear signal shall be immediately to ask, is strictly prohibited by guess.

Site post personnel must have necessary lifting knowledge, and familiar with relevant procedures and specifications. Main component assembly should be carried out in the morning, other hoisting work should be carried out during the day, avoid homework at night. Homework must have reliable enough lighting at night. Lifting of wind band 4 and cet 4 above shall be strictly forbidden, rain and snow will not lifting operations. Steel structure installation construction hoisting, construction personnel shall not near the rope below, workpiece and other dangerous places to stay. Hoisting not allowed anyone with workpiece or hoisting tool lifting, special circumstances must be along with the elevator, and reliable security measures must be taken by the relevant manager's approval.

Component assembly should be fitter, electrician is responsible for the maintenance of hoisting machinery equipment, such as when to stop working, should ensure that cut off power supply. All the steel structure installation construction personnel must wear safety helmet, aerial work must have a safety belt. No drunken steel structure construction and production of bungling the installation, it is strictly prohibited to forcibly peccancy operation.