钢板桩围堰施工的质量控制措施

发布时间:2016-5-28 11:20:08 浏览次数:636

1)钢板是沿轴的斜率比较时使用的就是抓住哥,哥只是一般陀螺形及幅度大或<标准宽度为板桩哥是根据实际的倾斜度及坡度较小时进行加工;也用绞车或葫芦和钢丝绳的反向拽再将锻炼。


1) plate is along the axis of the slope used in comparing is to seize the elder brother, brother is only general gyro shape and amplitude or < standard width for sheet pile elder brother is processed according to the actual inclination and slope is relatively small; with the winch or hoist rope and the reverse drag the exercise.


2)“拉风是进入地面标高,埋藏深度必须达到“拉风任何事长2倍以上的长度是紧密的方式呈矩形,烤拉风“文件(身弯誓大1 258a°是长)无法使用。


2) pull the wind is to enter the ground elevation and burial depth must meet the "pull anything long more than 2 times the length is close to rectangular, roast pull the wind" file (body bending oath large 1 258 "degree is long) cannot be used.


3)钢板都受到石块等过程中侧向挤压作用力大小容易发生偏斜,措施的错误:发生的倾斜位置的钢板上拔去。0m ~ 2.0m再往下锤들어。这样上下往复振拔,而大的块石豪打破或文件位置发生偏移,钢板的市政减少钢板件。


3) the size of the lateral extrusion force in the process of the steel plate is inclined to be inclined, and the error of the measure: the inclination of the steel plate is pulled out. 0m ~ 2.0m to hammer. This up and down the uplift, and stone big ho break or file location shift, reduce the plate of steel city.


4)拆除围堰前必须重新再泥砂及平了围堰拆除围堰内后方可。


4) before dismantling the cofferdam, it is necessary to re - sand and flat the cofferdam to remove the cofferdam.


5)钢板是注射过程中,有时会碰到一块石头或其他不明障碍减少钢板是进入深度不足,采用弧形转角是或是障碍物。


5) steel plate is the injection process, sometimes encounter a stone or other unknown obstacles to reduce the plate is to enter the depth of the problem, the use of curved angle is or obstacles.


6)基础较软的地方,有时发生。施工时邻居是暂时现象采取措施是邻近的几个种焊接在一起,并配备锁文件连接点588,黄油等润滑经济减少阻力。


6) where the foundation is soft, sometimes occurs. The construction of a neighbor is a temporary phenomenon to take measures to be adjacent to several kinds of welding together, and with the lock file connection point 588, butter and other lubricating economy to reduce resistance.


7)围护是很“拉风的电话后,先检查“拉风的是水。如果发现脱芯时,开口补插钢板桩减少缝隙中漏水、漏泥现象。检查水平围檩支撑接头,安装符合设计要求。在所有的检查和准备完毕后的坝身全面检查后方可进行围堰内疏浚。


7) enclosure is a very "cool phone, check the" cool water. If the core is found, the openings of the steel sheet pile to reduce the leakage and the leakage of mud in the gap. Check the level of the purlin joint support, installation meets the design requirements. After all inspection and preparation of the dam body after a comprehensive examination of the rear can be carried out within the cofferdam dredging.